Construction delays at Generation III+ nuclear power plants

An examination of the ease of construction of Generation III+ nuclear power plants, the delays and cost increases that occur in the construction phase.

Audience(s):
General public
Tags:
papers; psiru publication;
Last updated:
13 Aug 2024 (Created: 25 Nov 2020)
Public

Attached files

Construction delays at Generation III+ Nuclear Power Plants
  • MS Word Document
  • Ref: UOG122986
  • Size: 0.120MB
  • Updated: 13 Aug 2024